Case Study: David Ross Sports Village, University of Nottingham
Project: Prestigious fully equipped sports facility, including indoor sprint track, archery centre and climbing wall
Main Contractor: Kier Construction Ltd
Our Client: Metclad Ltd
Value: £2.3m
Service Provided: Construction Phase – Commercial Management
On behalf of its client, Cooper & Hall provided commercial control of the envelope works package, including: hot melt roof coverings, standing seam roof coverings, wall cladding, louvres, a ManSafe® system and permanent roof edge guard-railing.
As the design developed, C&H offered timely costing for specification changes, building a good professional relationship with the main contractor’s commercial team, in which both parties maintained certainty of expenditure and recovery throughout, leading to a speedy and successful Final Account.
Internal and external refurbishment of the operational Derby Road Campus buildings.
Construction of an award-winning, innovative new build school.
Prestigious new build exhibition space and adjoining hotel on Liverpool Waterfront.